<img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=353316&amp;fmt=gif">

Able-One Blog

Able-One Helps Kraus Flooring Save Money While Improving Server Reliability

As they grow, many organizations struggle with the challenges presented by separate locations and siloed business operations.  Kraus Flooring was facing this issue with separate servers in Waterloo and Winnipeg, each of which dealt with a different aspect of the business – which would switch back to the head office in the event of a failure.  This was aggravated by the fact that they were experiencing power reliability issues at the same head office, which was impacting their ability to provide consistent computing resources for the business, or handle disaster recovery effectively. They knew they needed to:

 

Kraus-Flooring.jpg

 

  • Create more robust, high-performance computing resources for their organization, while staying in budget.
  • Reduce the costs associated with running aging servers in separate locations.
  • Improve reliability and availability of their computing resources.
  • Create redundancy and disaster recovery for their business operations.

Able-One implemented an IBM power server configured with two logical partitions, modelled and sized to support the needs of their Winnipeg and Waterloo workloads. In addition, they consolidated Kraus’s x86 environment using VMware and shared storage.  The new power server was deployed in Able-One’s co-location facility in their London data center, which has the fire suppression, cooling, power and security measures that can be costly to implement in a customer’s computer room – and especially to duplicate in multiple locations. Able-One managed the entire project end-to-end, including migrating each of the server workloads to its partition on the power server in the data center.

With their new server consolidation in Able-One’s co-location facility, Kraus Flooring has achieved the economy of scale and reliability they sought.

Find out how exactly Able-One Systems helped Kraus Flooring achieve their goals. Download the full story here. 

Topics: Infrastructure

Signup for Our Monthly Newsletter